top of page
Feasibility Study of a Waste to Energy Plant for Nawabganj, Keraniganj and Dohar Upazilas in Bangladesh
Country: Bangladesh
Name of Client: Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ)
Value: US$ 66,500
The objective of the assignment is to carry out detailed study on Waste to Energy (WtE) technology, site selection for the proposed power plant, and business model development with different technologies for the proposed waste-to-energy power plant.
bottom of page