Feasibility Study for 1000 MW Power Plant

Client

Tata Power

Sector

Energy and Power

Country

Bangladesh

Timeline

2005-2006

Project Description

The project is to determine the feasibility of setting up 1000 MW power plant in Western Bangladesh and selling a portion of capacity in the local market based on the market need.


  • Overviewing different entities of the power sector and their roles (Specially REB), regulatory framework and impacts of relevant development.

  • Gathering information of the current physical system – existing generation capacity and existing transmission capacity

  • Assessing different aspects of the proposed addition like Generation – capacity, commissioning schedules (year-wise), location, ownership, fuel, likely pricing (fixed, variable, first year), sale arrangements, transmission – capacity and likely loading, tied capacity, likely pricing etc.

  • Assessing different market aspects like – Consumption pattern – West and East Bangladesh, Demand/Supply gap (region wise), Tariffs and realization, Collection efficiency of distribution companies and Transmission, Distribution & Commercial losses etc.

  • Conducting a feasibility study on various types on consumers and recommend the consumers for targeting.