Siddhirganj 2X120 MW Peaking Power Plant

Client

Asian Development Bank, Electricity Generation Company of Bangladesh (EGCB)

Sector

Energy and Power

Country

Bangladesh

Timeline

2006-2011

Project Description

Assist Electricity Generation Company of Bangladesh Ltd. (EGCB) in the implementation of the Siddhirganj 2 X 120 MW Peaking Power Plant by a 2 X 120 MW Gas Turbine, 3 X 10 MW steam plants, and 50 MW steam plant for Peaking Power Station at the Siddhirganj site.

  • Environmental impact assessment for the project.

  • Providing assistance on evaluation of bids, examination and checking contract documents & contractor’s report.

  • Supervision of demolition works as per standard safety & waste disposal regulations and monitor compliance of Environmental Regulations.

  • Checking, recommending and approving the drawings, specifications, and detailed work schedule submitted by the Turnkey Contractor.

  • Verifying contractor’s invoices, reviewing schedule of contractor’s work and contractor’s documents (engineering / procurement).

  • Supervised construction, testing, commissioning, and recommended provisional taking over certificate.

  • Witnessing factory tests, investigating and providing approval of the method for trial operation, test, commissioning procedures and acceptance tests.

  • Organizing and supervising local training provided by the Turnkey Contractor.

  • Checking the list of materials of the Stores handed over to EGCB vis-à-vis Contract Document