The project preparatory technical assistance (PPTA) required conductance of due diligence for the MFF and tranche 1. Tranche 1 was expected to include 4 to 6 sub-projects, consisting of new the rehabilitation, augmentation and expansion of transmission lines, substations and supporting Infrastructure. The main objective of the PPTA was to: i) Prepare the multitranche financing facility (MFF) of the Power Transmission Investment Program II and its first tranche; and ii) Assist the executing agency to undertake advance procurement.