top of page

Feasibility Study of a Waste to Energy Plant for Nawabganj, Keraniganj and Dohar Upazilas in Bangladesh

Client

Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ)

Country

Bangladesh

Value

66,500 USD

Feasibility Study of a Waste to Energy Plant for Nawabganj, Keraniganj and Dohar Upazilas in Bangladesh

The objective of the assignment is to carry out detailed study on Waste to Energy (WtE) technology, site selection for the proposed power plant, and business model development with different technologies for the proposed waste-to-energy power plant.

bottom of page